28 Aug (Wed) – Block-type thermal power station

Visit and guided tour: The Bremen-swb block-type thermal power station

Small field trip, IF-IS KEX 02

Wednesday, August 28, 2024
Time: 5:15 p.m. at the plant (after course time group transfer from the University)
Meeting point: Will be announced in the conference office.
Language: If participants who are English-speaking, but not German-speaking, are present, the guided tour will be in English.
Please think of: proof of identity (ID Card), sturdy shoes and sturdy clothes
Visitors who are dependent on mobility aids (e.g. wheelchair, walking stick, rollator, etc.) are generally not able to take part in the guided tours
Participants with pacemakers are obliged to make this known before the tour.

One of Germany’s most modern gas-fired power plants has been located in Bremen since 2023. swb has completed a highly efficient combined heat and power plant (CHP) at the site in Bremen-Hastedt.

Climate-neutral by 2035 remains the clear goal. The new combined heat and power plant replaces a coal-fired unit, significantly reducing CO2-emissions. It is also intended to ensure security of supply in the long term. As long as renewable energies are not yet available in sufficient form, generating energy from gas is an important technology for swb.

The power plant will be technically capable of using biomethane or hydrogen in addition to regular natural gas.

https://www.swb.de/ueber-swb/unternehmen/nachhaltigkeit/bhkw-hastedt

>Registration necessary

[top]